Skip to content
مورد مصر MAWRED EGYPT

Cleaning supplies for factories in Sadat City

Mawred Egypt supplies cleaning tools, equipment and consumables to factories in Sadat City and its industrial zones, and to office buildings, staff housing and schools there. This page is for procurement staff at a factory far from Cairo who want to plan their needs over set periods and get a written quote that covers them.

Updated

Warehouse aisle with cartons, cleaning trolleys, mop buckets and paper towel packs on racking

An industrial city on the desert road

Sadat City is in Menoufia governorate on the Cairo to Alexandria desert road. It is a new industrial city with several industrial zones, plus residential districts, a university and schools. Its plants work across many activities, and many of them are far enough from Cairo and the Delta that they rely on planning ahead more than on buying when something runs out.

That is the practical difference in Sadat. A plant that runs out of something simple, such as bin liners or mop heads, cannot always replace it from a shop nearby. It helps to build the order around a plan for a set period, covering the tools, their spare parts and their consumables together.

What each department needs

Department What sets its cleaning apart Catalogue items that fit
Production hall in food and pharmaceutical plants Colour-coded tools per zone, washable and sanitisable materials Double-bucket mopping trolley, 30 litre pedal bin, stainless hand dryer
Production hall in heavy industry Dust and oil, large areas, rough use Heavy-duty janitorial cart, 50 litre swing-lid bin
Stores and loading bays Packaging waste, aisles between racks Heavy-duty janitorial cart, 50 litre swing-lid bin
Staff washrooms and changing rooms Heavy use, wasted consumables Stainless hand dryer, pedal bin, double-bucket mopping trolley
Staff housing and admin buildings Rooms, washrooms and shared kitchen, offices and visitors Three-shelf trolley, bin with ashtray top, warm-air hand dryer

Plan for a period instead of buying on demand

Start by counting what the plant uses of each item over a normal period. Then sort items into two groups: durable tools such as trolleys, dryers and stainless bins, and consumables that are always being replaced, such as liners, mop heads and buckets. Order the tools once at fit-out or renewal, and put the consumables on a fixed recurring list whose quantities are adjusted each time.

A small cleaning store on site also helps. The supervisor issues and collects tools from it, and can see when an item is getting low before it actually runs out.

When choosing models, favour items whose spares and consumables are standard, such as a trolley whose buckets and bags are easy to replace. In a city this far out, a model that depends on a hard-to-find part soon turns into a tool that sits idle.

Staff housing

Many plants in the city provide housing for their workers or use housing nearby. These buildings need what any shared accommodation needs: a three-shelf trolley for the cleaner who does the corridors and washrooms, bins at the entrances and an ashtray bin where smokers gather outside. Put these needs on a separate list so they stay out of the production budget.

Ordering steps from Sadat City

  1. Send the list split by plant department, with the industrial zone number and address.
  2. Keep tools apart from consumables, and state the period the order covers.
  3. Give the number of workers, shifts and washrooms if you want suggested quantities.
  4. Submit through the quote request page, attaching photos of spare parts you want matched.

Our written quote itemises the products, compatible spare parts and their specifications by model. Delivery to the plant and the payment method are then agreed with you.

Frequently asked questions

Can the order include spare parts and consumables for the trolleys?
Yes, and in a city this far out it is worth doing. Order spare bags, buckets and mop heads with the trolley, so work does not stop because a small part wore out. The quote states which parts fit each model.
We want one consolidated order each period instead of small ones. How do we set quantities?
Look at what the factory used of each item in a previous period and add a small safety margin. If you have no figures, give the number of workers, shifts and restrooms in the request, and we suggest starting quantities that you adjust after the first period.
What should we check before installing hand dryers in worker restrooms?
Check with the factory electrician that there is a suitable power point near the basin, that the circuit can carry the dryer, and where it will be fixed on the wall. Mention the wall type in the request, and the quote confirms installation requirements for each model.
Do staff housing needs differ from the factory itself?
Yes. Housing needs tools for rooms, restrooms and the shared kitchen, plus bins in corridors and entrances, closer to shared accommodation than to a production floor. Put the housing on a separate list within the same request.

Need a quote for your facility?

Send your list of items and quantities and we reply with a written quote.